Case Studies

St. Pauls Cathedral

The project involved the design and installation of hot and cold water services, above ground drainage and supply and extract ventilation services to the refurbished crypt public WC area including the second fixing of all sanitary ware.

Learn more

Norwich Cathedral

The fourteen month project encompassed the complete existing lighting system replacement with a new sustainable LED system, remote switching and scene setting. The effects are stunning with all Heritage features illuminated beautifully.

Learn more

Apsley House

The project involved the removal of heating radiators to the Waterloo Gallery, installation of electric heat mats, replacing existing BMS controls, removal of DX coils to existing air handling unit and refurbishment of existing AHU.

Learn more

Wrest Park Country Estate

An amazing project for us to be entrusted with by English Heritage/Historic England, over a ten month period working closely with the client team and in house services to deliver this complete site wide HV/LV sub main upgrade.

Learn more

Winchester Cathedral

The project involved the installation of a new sustainable remote controlled LED lighting system enabling a reduction in cabling containment and access. All commissioning and programming for the project and future adjustment via remote keypad.

Learn more

St Dunstan’s Church

The project involved the upgrading of the complete lighting control system with dimmable LED sustainable luminaires. This encompassed the design, supply of control containment and installation of luminaires, lamps, commissioning and focusing. Risk issues were overcome via access and survey pre-programming.

Learn more

Cliffs Pavilion

The project involved replacement of the existing air handling unit, upgrade and adaptations of the existing control system and new motorised valves. The work was carried out in a timed and careful manner, lowering to the ground floor and then disposed of, with the new air handling unit being craned into position in one piece.

Learn more

Brunel University

We were employed as the principal contractor to replace the central boiler and hot water system plant serving this eighty room student residence building. All works were carried out during the summer recess and included the replacement of shower doors and complete redecoration of all bedrooms and common areas.

Learn more

Goldsmiths University of London

EV Bullen were appointed to carry out the installation of a new VRV and Ventilation System at St. James’s Block 3 in the Goldsmiths Campus. The installation was installed and designed to provide comfort heating and cooling to 2 no. large teaching areas.

Learn more

New Testament Church of God

The work involved removal of the existing boiler plant and replacement with two new 197kw boilers, pumps associated pipe work and installation of a new BMS management system with the facility to be accessed and controlled via a mobile application.

Learn more

St Anne’s & St Agnes Church

The project involved the installation of a new sustainable LED lighting and control system, complete with all associated electrical works and commissioning services.

Learn more

St John’s College Cambridge

The project involved the installation of a new sustainable LED system within the combination room and adjoining areas. The whole team worked closely to ensure the fabrics and décor were fully protected and that this unique dining room remained fully operational for the college fellows.

Learn more

St Mary’s Church

The project involved the installation of a new sustainable LED lighting & CCTV system throughout the worship areas. All new LED lighting is now controlled via a Lutron dimming control system, this gives multiple scene setting throughout to enable lighting levels to be set as desired, for each service.

Learn more

Kingston Grammar School

The existing heating and controls system at the school were over 25 years old and past their life expectancy. E V Bullen were commissioned to replace the entire heating and controls system in the school over two six week summer break phases.

Learn more

Hickeys Chapel

The existing lighting system consisted of high-power consuming tungsten filament and halogen light fittings, requiring significant maintenance and lamp replacement

Learn more

Metropolitan Police Electric Vehicle Charging Points

Installation of Electric Vehicle Charging Points for the Metropolitan Police

Learn more